TAW knowledge Test 1
How many BDV in Taweelah
13
TFP EDP is which of the following
EDP 2.6
If you press TFP EDP which of the following will be activited
XV-409
XV-410
XV-412
XV-411
In normal operation if you directlly pressed on Matrix panle EDP what will happen
Nothing will happen
if you went to LCR to remove knife Edge of BDV-409 what will happen
BDV will be open
location of XV-409
Near instrument air compressor platform.
location of XV-411
Near instrument air compressor platform.
What is TRF train 1 outlet pressure high alarm before PSD
61
TRF train 1, PSD trip setting is
62 Bar
What is TRF train PSD + HIIPS" trip setting
*meainig the first HIIPS followed by the second HIIPS activation
63 bar
What is the minimum flow in MMSCFD required for TRF heater permissive to start
42
What is TRF train 1 (Heater outlet Temperature High High) in degree celsius
110C
What is TPS-PRS slam shutdown high high trip setting for XV-331 & XV-341
41 Bar then 42 Bar
what is TFP Heater High high flow trip setting in MMSCFD
230
What is the Max capacity for TRF train 1 in MMSCFD
1100
What is TFP Heater Low Low flow trip setting in MMSCFD
20
what is TRF outlet Low low pressure for trip,
25bar
What is TFP outlet Low low pressure for Trip.
25bar
What is instrument Air low low trip setting.
4bar
Can you start TRF Heater with 3 pilots only.
No, its required 4 pilots to start with burners
If Contractor come to Taweelah, on weekend, What are the things you have to check.
1- Check if the Activity in the planning.
2- Check if the have NIP permit or give new NIP permit
3- if the dont have NIP permit, as well Activity not in the planning, Contact related department engineer or senior.
4- if engineer said no one informed kick them out. and ask them to send them Email
If you are on ESD 1.0 annual Test, Can you give ESD 1.0 push botton from MCR matrix panle and rest & Aknlowedge the alarm
No, Dont give rest, only Aknowledge.
on Annual ESD 1.0, we close one Train inlet MOV the. equilize the pressure with outlet. why we do this.
is this Answer right:
To avoid at least 1 TRF train not on HIIPS tripp, this will give you premissive to open TRF outlet XV-170 and XV-171
Before ESD 1.0 is better to Note TRF outlet flow and TFP outlet flow
Yes, better so you can put the same amount again
Before ESD 1.0 DUSUB will reduce thier flow consumption to around 700 to 800 MMSCFD
as per 2024 ESD1.0 Yes, they were 1,000 and dropp to around 800 or 700 to avoid big drop of pressure in MJP pipline.
What is the maximum & minimum, Allowable Export pipline pressure.
Max 140 Bar, Min 115 bar
However they witness up to 109 Bar and it was very critical at that time.
Also they didnt witness more then 140 Bar is ras laffan will reduce to avoid high pressure.
What is the TRF outlet tempreture
What is TFP outlet Tempreture
What is the Tempreture in TPS
please check and write it all down.
?
what is the first thing you have to do when you Entre the shift.
1- Check all handover & get updated
2- check TRF daily report to get updated about the things got done.
3- check SAP system what are the fault Sap raised.
4- if you are away for 4days or on leave got yourself updated about all this time.
5- if any isloation or something on site just have a look on the location
6- most important check same day planning & tomorrow planning
which ROV and MOV stoke check we can do on CRS with no ittrepaution of flow please check
?
How to make HIPPS valadation, we are taking about the one wich not required the passing rate check.
1- make sure the train on stand by.
2- make sure to put requited train "PSD on MOS for example train 1 PSD on MOS.
3- Close inlet of the train 1, then open PCV to equilize the pressure with outlet.
4-close the PCV and close outlet MOV of TRF train 1.
5- Now you can make the Test by open equlizing line in inlet and pressure up slowly till HIIPS activite on high high pressure.