Construction Solving looksfam

Find the swell of a soil that weighs 1661 kg/m ³ in its natural state and 1186 kg/m³ after excavation.

40%

Find the shrinkage of a soil that weighs 1661 kg/m³ in its natural state and 2077 kg/m³ aftercompaction.

20%

A soil weighs 1163 kg / L * m ^ 3 (loose cubic meter),1661 kg/Bm^3 (bank cubic meter), and 2077kg/Cm^3 (Compacted cubic meter). How manybank cubic meter (Bm^3) and compacted cubicmeter (C * m ^ 3) are contained in 593,300 L * m ^ 3 ofthis soil?

Hint:

Bank Volume = Loose cubic meter x Load Factor


Compacted Volume = Bank cubic meter x Shrinkage Factor


Bank cubic meter = Loose cubic yard x LoadFactor


Compacted cubic meter = Bank cubic meter xShrinkage Factor

Bank Volume = 415,310.00 Bm^3 Compacted Volume = 332,248.00 Cm^3

Find the base width and height of a triangularspoil bank containing 100 BCM(76.5 BCM) if thepile length is 30 ft (9.14m) , the soil's angle of repose is 37°, and its well is 25%.

B = 7.45m H = 2.8m

Find the base diameter and height of a conical spoil pile that will contain 76.5 BCM of excavation if the soil's angle of repose is 32° and its swell index is 12%.

D = 10.16m H = 3.17m

Find the volume (bank measure) of excavation required for a trench 0.92 m wide, 1.83 m deep, and 152 m long. Assume that the trench sides will be approximately vertical.

255 BCM

Estimate the actual bucket load in bank cubic meters for a loader bucket whose heaped capacity is 3.82m ^ 3 The soil's bucket fill factor is 0.90 and its load factor is 0.80.

2.75 BCM

Find the expected production in loose cubic

meters (L * m ^ 3) per hour of a small hydraulic excavator. Heaped bucket capacity is 0.57m ^ 3 The material is sand and gravel with a bucket fill factor of 0.95. Job efficiency is 50min / h Average depth of cut is 4.3 m. Maximum depth of cut is 6.1 m and average swing is 90°.


Hint:

Production (LCH/h) = CxSxVxBxE

Cycle output = 250cycles/60 * min

Swing-depth factor = 1

113 LCM/h

Find the expected production in loose cubic meters per hour of a 2.3m ^ 3 hydraulic shovel equipped with a front-dump bucket. The material is common earth with a bucket fill factor of 1.0. the average angle of swing is 75° and job efficiency is 0.80.

Hint: Production (LCMh) = CxSxVxBxE

Cycle output = 150cycles / h

Swing = 1.05

290 LCM/h

Determine the expected dragline production in loose cubic meters (LCM) per hour based on the following information: Dragline size = 1.53m³
Swing angle = 120 deg Average depth of cut = 2.4m

Material = common earth

Job efficiency = 50 min / h Soil swell = 25%


Hint: Expected production = Ideal output x


Swing-depth factor x Efficiency


Ideal output xt = 176B /h


Swing-depth factor - 0.9

165 LCM/h

Estimate the production in loose cubic meters per hour for a medium-weight clamshell excavating loose earth. Heaped bucket capacity is 0.75m ^ 3 The soil is common earth with a bucket fill factor of 0.95. Estimated cycle time is 40 s. Job efficiency is estimated at 50min / h

53 LCM/h

A wheel tractor-scraper weighing 91 t is being operated on a haul road with tire penetration of 5 cm. What is the total resistance and effective grade when the scraper is ascending a slope of 5%?

Hint: RRF =20+(6 x cm penetration) GRF = 10 x grade (%)

9100 kg & 10%

A crawler tractor weighing 36 t is towing a rubber- tired scraper weighing 45.5 t up a grade of 4%. What is the total resistance of the combination if the rolling resistance factor is 50kg / (t')

5535 kg

A four-wheel-drive tractor weighs 20,000 kg and produces a maximum rimpull of 18,160 kg at sea level. The tractor is being operated at an altitude of 3050 m on wet earth. A pull of 10,000 kg is required to move the tractor and its load. Can the tractor perform under these conditions?
Hint:

Maximum usable pull = Coefficient of tractor x Weight on drivers Derating factor = [Altitude (m) - 915 ]/102

Coefficient of traction = 0.45

Because the maximum pull as limited by traction is more than the required pull, the tractor can perform under these conditions.

A power-shift crawler tractor has a rated blade capacity of 7.65 LCM. The dozer is excavating loose common earth and pushing it a distance of 61 m. Maximum reverse speed in third range is 8 km / h Estimate the production of the dozer is job efficiency is 50min / h

Hint: Production = Volume per cycle x Cycle per hr

Fixed time = 0.05 min Dozing peed = 4km / hr

271 LCM/h

Estimate the hourly production in loose volume (LCM) of a 2.68m ^ 3 wheel loader excavating sand and gravel (average material) from a pit and moving it to a stockpile. The average haul distance is 61 m, the effective grade is 6%, the bucket fill factor is 1.00, and job efficiency is 50 min/h.

Hint: Production = volume x cycle per hour

Fixed time - 0.50 min

Variable time - 0.3 min

178 Lm³ /h

The estimated cycle time for a wheel scraper is 6.5 min. Calculate the number of pushers required to serve a fleet of nine scrapers using single pushers. Determine the results for both back-track and chain loading methods.
Hint:

Number of scrapers served = Scraper cycle time / Pusher cycle time

Number of pushers required = Number of scrapers/Number served by one pusher

Pusher cycle time = 1.5 min (Back-track) & 1.0 min (Chain)

2 and 3

Find the expected production of the scraper fleet of the previous problem if only one pusher is available and the chain loading method is used. Expected production of a single scraper assuming adequate pusher support is 173 BCM/h.
Hint:

Production = [No. of pushers/Required number] x No. of scrapers x Production per scraper

1112 BCM / h

Given the following information on a shovel/truck operation, calculate the number of trucks theoretically required and the production of this combination.
Shovel production at 100% efficiency = 283 BCM/h

Job efficiency = 0.75

Truck capacity = 15.3 BCM

Truck cycle time, excluding loading = 0.5h

Hint:

Load Time = Haul unit Capacity / Loader production at 100% efficiency

Number of haulers required (N) = Haul unit cycle time / Load Time

11 trucks and 212 BCM/h

24.1 km of gravel road require reshaping and leveling. You estimate that six passes of a motor grader will be required. Based on operator skill, machine characteristics, and job conditions, you estimate two passes at 6.4km / h , two passes at 8km / h and two passes at 9.7km / h If job efficiency is 0.80, how many grader hours will be required for this job?
Hint:

Estimating Grader Production Time(h)

= [sum (Numberofpasses x Sectionlength(km))/(Averagespeed for section(km / h)] * 1/(Eff)

23.1 h

Trial blasting indicates that a rectangular pattern of drilling using 7.6-cm holes spaced on 2.75-m centers and 6.1 m deep will produce a satisfactory rock break with a particular explosive loading. The effective hole depth resulting from the blast is 5.5 m. Determine the rock volume produced per meter of drilling.

Hint: Volume / m = Volume per hole (m³) / Drilled hole depth (m)

6.8 m³ / m

A jaw crusher is producing 227 t/h of crush gravel and discharging it onto a three-scre deck. The top screen in the deck is a 38-m screen. The gradation of crusher output sho 100% passing 76 mm, 92% passing 38 mm, a 80% passing 19 mm. Material weight is 18 kg / m * 3 Find the minimum size of the 38-m screen to be used. Check both total screen la and screen passing capacity. Hint:

Basic capacity:


Total feed = 62t / h / (m²)


Passing screen = 34t / h / m²


Deck position factor (top) = 1 Half-size factor (80%) = 1.8


Oversize factor (8%):


Total feed = 0.96 Passing screen = 1.04


Weight Factor = 1.15

2.9 m³

[NOV 2022)

Calculate the volume of plastic concrete that will be produced by the mix design given in the table.


Component Sp.Gr Quantity


Cement 3.15 154

Sand (SSD) 2.65 426

Gravel (SSD) 2.66 549

WATER 1.00 95

0.51 m³

Determine the actual weight of each component to be added if the sand contains 5% excess moisture and the gravel contains 2% excess moisture.

Component Sp.Gr Quantity


Cement 3.15 154

Sand (SSD) 2.65 426

Gravel (SSD) 2.66 549

WATER 1.00 95

Water = 63kg
Sand = 447kg

Gravel = 560kg

Determine the weight of each component required to make a three-bag mix and the mix volume.

Component Sp.Gr Quantity


Cement 3.15 154

Sand (SSD) 2.65 426

Gravel (SSD) 2.66 549

WATER 1.00 95

Cement, 127.8 kg
Sand, 370 kg

Gravel, 464 kg

Water, 52 kg

Mix Vol, 0.42m³

Determine the weight of each component required to make a three-bag mix and the mix volume.

Component Sp.Gr Quantity


Cement 3.15 154

Sand (SSD) 2.65 426

Gravel (SSD) 2.66 549

WATER 1.00 95

Cement, 127.8 kg
Sand, 370 kg

Gravel, 464 kg

Water, 52 kg

Mix Vol, 0.42m³

Calculate the maximum hourly production of an asphalt plant based on the data in the following list.

Mix composition:

Asphalt = 6%


Aggregate composition:

Coarse A = 42%

Coarse B = 35%

Sand = 18%

Mineral filler = 5%

aggregate moisture = 8%

Dryer capacity at 8% moisture removal =110ton / h


Hint:

Plant Capacity (Dryer Capacity x 10⁴ ) /

(100-asphalt%) (100-fines%)

123 ton/h

Using the driving data below, determine the safe load capacity of a 6-in.-square concrete pile 60 ft long. Assume that the unit weight of the piles is 150 lb/cu ft.

Pile driver energy = 14000ft - lb


Ram weight = 4000 lb


Weight of driving appurtenances = 1000lb


Average penetration last six blows = 1/5 in/blow


Hint: K = 0.2


R=( 2E / S+0.1 ) { (Wr + KWp)/(Wr+ Wp)}

59,862 lb

Calculate the safe load capacity of a bulb pill based on the following driving data.

Hammer welght = 3tons


Height of drop = 20ft


Volume in last batch driven = 5 cu ft


Number of blows to drive last batch = 40


Volume of base and plug = 25cuft


Selected K value = 25


Hint:


L = ((W x H x B x V⅔))/K

164 tons

Determine the design lateral force for the slab form 152 mm thick, 6.1 m wide, and 30.5 m long. The slab is to be poured in one pour. Assure concrete density is 2403kg/m³ and that the formwork weighs 0.72 kPa.

Hint: H = 0.02 x dl x ws

1.46 kN/m

Quiz
HGE 1
Chapter 10 Muscle tissue
Social Psychology
history 2
SDR Objection handlingh
Metod och statistik psykologi 2
Tarea para
révision espagnol femme
232 Changing Weight & Body CompositionWeek 10
Collection de joaillerie, rose des vents de la maison Christian Dior
rose des vents dior joaillerie
So-begrepp (12 sista)
So-begrepp (12 första)
spaans pww
Evolution
Begrepp
functionalism
roles, status & stereotypes
sociology
Glosor 2/4
chem test
cours 7 semestre 2 droit civil
competencias
POH R22
GS TOETS AW 3
Traitement du LE : modélisations et évaluation
inglese giulia
crpe
cyber security 13
cyber security 12
cyber security 11
it management 8-9
232 HydrationWeek 9 lectures
WW1
Transition metal ion colours
lessico inglese
Näringslära
260
Engels Vocabulairy 1.1 t/m 1.4 - copy
FAR Leases
Filipino
economie
segnaliflashard segnali
Cardiology Drugs
Osteologia
Biology Unit
cardiovascular syatem
health
physical educ.
Engels Vocabulairy 1.1 t/m 1.4
biologia
American Gov Vocab
artspls
musicsir cassi f u
english
10 theories
Romantismo Brasileiro
Arcadismo
Economia, política e religião da grécia antiga
Economia persa, evolução política persa e religião persa
Hebreus
Fenícios
Egito antigo
Mesopotamia
Período Neolítico
Período Paleolítico
anglais aeroportuaire
International Appetizers
Appetizers
Definition of Terms
Chaussant du pied diabetique
Bio 112L Urinary System
Latinska namn
Income from other sources
capital gain
week 10-acne trts
b
Vocabulaire de la semaine 12
anglverbes irréguliers
Modalities Final Theory Exam Review
Modalities Midterm
Acustica
français
Apparato Gastrointestinale
crime and law modern studies national 5
modern studies national 5
Gs hs 4
RECRUTAMENTO INTERNO,EXTERNO E MISTO
Russian Revolution
f 4
sam
sammy
módulo 1 Q
french testi need to remember these words
cyber security 12
cyber security 13
cyber security chapter 11
the geography of italy
Hamletthe book 'hamlet' by shakespeare
verifica storia 26/03fascismo in italia
il barone rampante dal capitolo 20 al 30
irish orals 26-31
irish orals 14-2514-25
Comportamentos Éticos e Compliance
Salud
Besöksnäring-Turism
equazioni e disequazioni logaritmiche
Signes cliniques des aphasies, grands tableaux sémiologiques
irish orals 1-13question 1- 13
Déf et étiologies des aphasies
Neuroanatomie fonctionnelle du langage et voies de ttt du langage
hoofdstuk 3
Personen en begrippen HC 4 nieuwe tijd 1
Biologia 1
✩・:*German ⭒✩・:
직업 👮‍♀️👨‍🏫🧑‍🔬
cyber security 10
it management chapter 7
cyber security chapter 9
farmacocinética aplicadaa odonto
biologi prov genetik
Anthro week 10-11
Matemática Financeira
préposition des verbes
Koine Greek Ch. 25 Imperative Mood
English
Noções de Probabilidade e Estatística
vocabulary 1
Anglais
집 🏠🛋️🪑
교실 👩‍🏫📚📝
módulo 1 B
BABY BOOMERSAtividade de Cargo e Salário
Fatores bioticos e abioticosPerguntas sobre oq é biotico e oq é abiotico
digestão
Biologi
Engels Unit 3 Vocabulairy 3.1 t/m 3.4 + Phrases - copy
Spaans: Zomervakantie
attack on the queen
vicab
ss
Hur Sverige styrs
Ethics
GSS35L
Osteoporose
gs
hl bio test pt. 2ha
communicazione interculturale UD 2
bio hl test -- dnahh
L2 S2 : Relations internationales
history
hp morfem + suffix
Biologia 5
Teste de inglêsisso é um flashcard tudo está no livro prestem atenção n ligem pro nome do grupo "história"
Comportamento do consumidor
Laís
Teste de históriaisso e um flashcard Teste de história prestem atençao essa perguntas estão n o livro
help
SRA Principles
indicateurs de temps
féminin ou masculin
Discours direct et indirect
Hypothèses
redes urbanas
définition stss
english
Modalities Week 9-11 Flashcards
biggest countries in the world
upper flags of us
english exam
FAR Impairments
disegno
atendimento bancario
DERECHO DEL TRABAJO
biologie: stofwisseling
Personen en begrippen HC 3 Nieuwe tijd 1
HISTÓRIA GERAL Primeira Guerra Mundial. O nazifascismo e a Segunda GuerHISTÓRIA GERAL Primeira Guerra Mundial. O nazifascismo e a Segunda Guerra Mundial. A Guerra Fria. Globalização e as políticas neoliberais. HISTÓRIA DO BRASIL A Revolução de 1930 e a Era Vargas...
SAE CIRÚRGICA
All kanji
Distinção entre direito federal e direito dos estados
CARDIO
März-April
GINECO
Sudorese
teste
av2
América e África regionalizações e organizações internacionais
Evolução biológica
Reprodução assexuada, mitose e meiose
Reprodução assexuada, mitose e meiose
FAR Intengible Asset
week 13
latn 8
módulo 1 M
practical lab 4
DP-203
AUTOMAÇÃO 2MALHAS, SISTEMAS, CONTROLE, AUTOMACAO,DIAGRAMA DE BLOCOS
AUTOMAÇÃO 2ALGEBRA DE BOOLE, VALVULAS E ETC
kanjikanji p4
Processo Civil
funções da linguagem
ARTE - copy
easter
ARTE
compTIA security
reino plantae
biologia
Esôfago
Cadeia Carbônica
redes urbanas
AIK
Inglês Nivel 1 e 2
biological explanations for schiz
droit notarial exam 1
wiskundekwadraten t/m 25
poliktik och demokrati
duits schrit 1 (4)
duits schrit 1 (3)
duits shrit 1 (2)
duits schrit 1
Intangible Assets
verbs e questions
CHAPTER 5: INTERNATIONAL FINANCIAL INSTITUTIONS AND GLOBAL CORPORATION
AS BUSINESS | Unit 2 exam revision
spanska
C1-C2 level italian vocabulary
B1 B2 level italian vocabulary
important and hard italian vocabulary
italian vocabulary
plant ID week 4
anatomy bio
Biologydigestion
Week 8- Skin Care2: Treating Hyperpigmentation
Wk 8 - skincare 2 Intro to Chemical Exfoliation
tutorial lab 3
Week 7- Skin care 2: UV & Pigmentation
Week 6- Skin Care 2: Serums & MLD
examen 1
9.1
bio 112L digestive
Bio 112 L stomach digestive ahhh
Опорно-рухова система людини
Skogsbrandhund
Nervos CranianosOrdem Localização Tipo Responsabilidade
Cardio
philosophy
CHAPTER 4: THEORIES OF GLOBAL STRATIFICATION (CONTEMPOPARY WORLD)
vetenskapliga perspektivinför tenta
spagnolo
Computer
Analise de documentos
saldaçoes
fisiologia
Entre os estudos iniciais em Psicologia do Esporte encontra-se o de Fitz (1897),
Religion
CHAPTER 3: MARKET INTEGRATION (CONTEMPOPARY WORLD)
swedish hjälp verbndnxnx
JobsRevise jobs studied
german 21
Art B1 Midterm Study
PathologieLa douleur
introduction
metabolismo
Quiz 2 (Lessons 7-12)
celler
Vocabulaire de la semaine 11
Presentation 6
Economie H14/15/16 Formules
försvarsmekanismer
kommunikation
GI Drugs
primeira guerra
Preposotions of PlacePrepositions of place describe the location of people or objects in relation to other things.
m tecnique