CE 7

Construction Project Cycle
A construction project follows a step-by-step lifecycle:

Initiation

Planning & Design


Procurement


Construction


Commissioning


Closeout

There must be mutual understanding and consent (offer and acceptance) between parties.

Agreement

Each party must receive something of value (e.g., contractor gets paid, owner gets a structure).

Consideration

Parties must be legally able to enter into the contract (e.g., legal age, mental fitness).

Capacity

The contract must not involve illegal activities to be enforceable.

Legality

Fixed price for a completed project. Encourages clear design and planning. Risk of cost overruns falls on the contractor.

Lump-Sum Contract

Payment based on measurable units of work. Suitable when project quantities are uncertain (e.g., excavation). The owner pays for actual quantities used.

Unit Price Contract

Reimbursement of actual project costs plus a fixed fee or percentage. Good for projects with unclear scopes. It transfers cost risk to the owner but gives contractors little reason to cut costs unless incentives are added.

Cost-Plus-Fee Contract

One entity handles both design and construction. Speeds up project delivery but reduces owner control over design specifics.

Design and Build Contract

Refers to the acquisition of goods, consulting services, and the contracting for infrastructure projects by procuring entity. (Sec. 5(aa), IRR, R.A. 9184)

Procurement

Refer to all items, supplies, materials and
general support services, except consulting services and

infrastructure projects, which may be needed in the transaction of

public businesses or in the pursuit of any government undertaking,

project or activity. (Sec. 5(r), IRR, R. A. 9184)

Goods and Services

LCRB stands for

LOWEST
CALCULATED RESPONSIVE BID

BAC

Bids and Awards Committee

ABC

Approved Budget for the Contract

Is a document that explains in detail the objectives, scope, and
implementation methods of a project.

Terms of Reference (ToR)

Functions as a
guideline that helps the projject team or stakeholders understand

the context and scope of the work to be carried out.

Terms of Reference (ToR)

ToR

Terms of Reference

Presidential Decree No. 442

The Labor Code of the Philippines

those with capabilities to construct vertical and
horizontal structures that are general in nature, or are commonly

constructed.

General Contractors

those with special capabilities to construct
highly specialized projects such as roads and bridges, or those that

deals with specific aspects of construction, such as steel works,

plumbing works, electrical, mechanical equipment and systems

installation.

Specialty Contractors

The Bidding Document shall include the following:

a. Approved Budget for the Contract;
b. Invitation to Bid;

c. Minimum eligibility requirements;

d. Instruction to Bidders;

e. Technical Specifications;

Why do disputes arise?

• Delays on a contract.
• Lack of understanding of the contract.

• Failure to administer the contract.

• Unsubstantiated or incomplete claims being made by the parties

involved.

Reduce the possibility of disputes arising:

• Make significant upfront planning before beginning work.
• Carefully read and understand the contract.

• Negotiate clauses that are murky or potentially problematic.

• Deal with problems as they arise, do not postpone them.

• Be diligent when it comes to pre-construction work.

• Make schedules realistic and executable and plan for delays and

disruptions.

• Document any issues and challenges that arise during the execution

and plan for delays and disruptions.

• Identify risks in advance and consult specialists.

includes the agreement that if a cause for
a dispute should arise between a contractor and a project owner, these

parties will attempt to reach a just and satisfactory resolution between

themselves before moving on to other means.

negotiation

A clause suggests the inclusion of a neutral third party in the
dispute situation to help mediate the process of resolving the dispute

mediation

An alternative to mediation is expert determination which is used to
resolve disputes of a specialist nature or in cases where there is a

valuation dispute requiring a specialist's opinion.

Expert Determination

includes a neutral third party but unlike
with the mediation method, the adjudicator will give a decision,

whereas the mediator will assist parties in finding the resolution.

Adjudication

parties agree to the arbitrator who has the relevant
experience to engage in the matter. The arbitrator considers documents

and facts that concern the situation, and can make a decision that favors

one side if the parties fail to achieve consensus.

Arbitration

usually also included in the dispute clause, in case the
parties do not find any other way to resolve the issues that have come

up. Litigation involves a trial and is legally binding and enforceable,

though it can also be appealed.

Litigation

Quiz
mot 545
Vorstellen
Vegetables & Fruit
Phrasal verbs
swedish words day1
niu prov
Fhrasal verbs
House
State capitals
ANS test 3
Supermakt einkaufen
6.2
Kommunikation in Krisensituationen
French
6.1
French unit 4
Vocabulaires
21 avril
lerrnen
Vocabulaire
Metaf
drug conversion
usage externe
usage bucco-pharynge
GYNDA
teknik förhör
unité 4 volet 2
WW1 - Ryska revolutionen & Sverige plus Norden
Fahrzeuge
test 3
Tronc commun
farmaci
fromage
chem paper 2
h
Rizal
interacciones en las comunidades
Wellness & Self-Care (健康与自我照顾)
Social Life & Relationships (社交与关系)
Career & Ambition - 职业与野心
Dermato
ses C7
sys cardiovasculaire
اخْتِبَارُ الْمُفْرَدَاتِ
régime amaigrissant
Pädagogen
pam
kristendomen✝️
Verbi irregolari (passato prossimo)
mot 55