Ovido
Lingua
  • Inglese
  • Spagnolo
  • Francese
  • Portoghese
  • Tedesco
  • Italiano
  • Olandese
  • Svedese
Testo
  • Maiuscole

Utente

  • Accedi
  • Crea account
  • Passa a Premium
Ovido
  • Home
  • Accedi
  • Crea account

rm osh

CAN HELP MANAGE CONTROL SAFETY AND SECURITY IN SOME INSTANCES.

PERSONAL PROTECTIVE EQUIPMENT

to protect them when they undertake certain duties or engage in certain activities

Employees

Working in extreme conditions

Employees

Handling petrol or other flammable liquids;

Employees

Dealing with hot products, food, or drinks;

Employees

Cleaning and dealing with chemicals

Employees

to protect them when they participate in activities as part of their trip, travel, or tour which have been identified through internal risk management procedures as posing a potential threat/risk.

Customers

Travelling/touring in extreme conditions.

Customers

Using/wearing helmets, guards, and other protective items when playing sport or games or engaging any adventure-type activities which carry inherent dangers

Customers

Wearing seat belts in vehicles

Customers

USE OF ______ IS THE LOWEST LEVEL IN THE SIXTIER HIERARCHY OF CONTROLS AVAILABLE TO ADDRESS RISK.

PPE

THE HIERARCHY OF CONTROLS CONSISTS OF

Elimination
Substitution

Isolation

Engineering Controls

Administrative Controls

PPE

the second most acceptable method involves replacing the hazardous process/procedure or product with a less hazardous one.

SUBSTITUTION

the most effective option: involves getting rid of the threat/risk

ELIMINATION

requires changing/making physical alterations to the workplace, site, or processes to

ENGINEERING CONTROLS

means removing people from the threat or moving the danger away from people to a safe distance, or erecting/using a protective barrier/shield of some kind.

ISOLATION

Limit the risk in an event occur

ENGINEERING CONTROLS

Suppress or contain the risk; and

ENGINEERING CONTROLS

Minimize the generation of risk;

ENGINEERING CONTROLS

requiring (for example) the busines to:

ADMINISTRATIVE CONTROLS

Develop necessary protocols

ADMINISTRATIVE CONTROLS

Train staff as appropriate; and

ADMINISTRATIVE CONTROLS

Provide assistive technology or equipment to help with required activities/work;

ADMINISTRATIVE CONTROLS

Restrict access to an area or activity;

ADMINISTRATIVE CONTROLS

Example of PPE

Face mask
Hard hat

Protective vest

Fire safety practices

Protective hand gloves

Use carpets or textured flooring instead of smooth, slippery surfaces

Substitution

Remove the use of highly polished, slippery tiles and replace them with non-slip flooring

Elimination

Install proper drainage and anti-slip mats to reduce slip hazards.

Engineering Controls

Restrict access to the area when floors are being cleaned or when spills occur

Isolation

Provide non-slip footwear for employees working in slippery areas

PPE

Train housekeeping staff on proper cleaning procedures and use "Wet Floor" signs

Administrative Controls

is a passive approach in which the place/activity will be safe regardless of who uses it (their age, gender, experience, size, and capability

safe place

is an active option relying on the person to take certain action/s to remain safe.

safe person

Quiz
world weather today
Les inféctions
Les parasites
Sista rycket
Vitaminer hemkunskap
biologie2
Aspetto verbo pt2
Aspetto del verbo, conoscenze pt 1
Vocables
spanska
Eva🩷
EU
Eva🩷
Industrialism frågor från presentation
Beskärning prydnadsbuskar
ConstitII TD 1 - 5
kapitel 8 vocab
Nyckeltal
redovisning
sss
Understanding the Self 1.2
glossor
head and neck
12
Skadetyper & Sjukdomar/Ortopedi
the philosopher's way
Skelettet/Ortopedi
ak toetsweek 3
Lägesanvisningar/Ortopedi
Rörelsetermer/Ortopedi
Kroppsdelar/Ortopedi
Unit 7 am 24.März!
Traduce_semana_12
Vocabulary_week12
정신 이상행동
Les molécules
raw
5.6 Kemi åk 8 Organiska syror i frukt och i din kropp
Gelombang
ص ۲۰۲ به بعد
suoran objetiivinen
PR 1
MILMILA 18TH QUIZ🦔
prov spanska/begrepp öva
prov spanska/ skriva
prov spanska/begrepp
Mikrobiologi 3
TRAVELS
La quiz joe dimaggio
Ledarskap och projektledning tenta 3