Ovido
Idioma
  • Inglês
  • Espanhol
  • Francês
  • Português
  • Alemão
  • Italiano
  • Holandês
  • Sueco
Texto
  • Maiúsculas

Usuário

  • Entrar
  • Criar conta
  • Atualizar para Premium
Ovido
  • Início
  • Entrar
  • Criar conta

software Engineering- test 1 - extra notes (part 6)

Incremental iterations

is a process that combines the iterative design method with the incremental
build model. Project is started with a comparatively small task or component and increments are made

in each cycle of the iterations until desired product is reached

The term CI/CD, Continuous Integration/Continuous Deployment includes the below tasks
continuously

(1) continuously integrating the completed functionality,
(2) delivering that feature to the users, and

(3) having the users deploying that functionalities.

Functional testing

usually uncovers some problems that will require fixing by the programmers. The cycle of
problem detection to problem-fix needs to be coordinated between the testers and the code fixers.

SDLC

Acronym of Software Development Life Cycle.

RUP

Rational Unified Process

RUP

Phase 1: Inception
Phase 2: Elaboration

Phase 3: Construction

Phase 4: Transition

Chief Programmer Team Approach

It is a type of coordination and management methodology rather than a software process.

Entry Criteria

The entry criteria for an activity must be met before the activity can start.

CMM

CMM stands for Capability Maturity Model. It was developed in the late 80s.

CMM is a method which is used as a benchmark to evaluate and measure the maturity of the software

development process of an organization.

CMM measures the maturity of the software development process on a scale of

1 to 5

The Software Engineering Institute (SEI) Capability Maturity Model (CMM) specifies an increasing series of
levels of a software development organization.

The higher the level, the better the software development
process, hence reaching each level is an expensive and time-consuming process.

Levels in CMM

1. Initial
2. Repeatable/Managed

3. Defined

4. Quantitatively Managed

5. Optimizing

Level 1: Initial level is also called?

a chaotic level.

Quiz
diritto ue
Software engineering -test 1-(part 5)
Petroleo, imperialismo y colonialismo
LÄKEMEDEL OCH LÄKEMEDELS BERÄKNING
Spanska prov
Random Knowledge
software engineering -test 1-(part 4)
software engineering -test 1-(part 3)
Vocabulaire médical
aamupala, juomat
prise en chage des traumatismes
trauma des menbres
mathe
kofu
frilufsliv
Engelska Glosor
FVG 19 Colormanagment
zigge
software engineering -test 1-extra notes (part2)
Software engineering test 1 - extra notes
Gas Exhange, Transport and Breathing Control
Körkortsfrågor
pronomen
Antimikrobiella läkemedel
Globala marknader
religion
vetenskapliga ord vecka 8
lp7
LP7
philo 2 exam 1
Repiratory System
sst uae
kap 4 45-60 ord
LP7 Learning Objectives
kap 4 31-45 ord
kap 4 16-30 ord
kapitel 4 1-15 ord
Unit 6 (3 KL)
BASSIN CHAP 2
kap 1 46-60
kap 1 31-45 ord
kap 1 15-30 ord
kap 1 1-15
kap 3 60-80 ord
kap 3 46-60
BWL1
kap 3 31-45 ord
kap 3 16-30 ord
kap 3 15 ord
glosor