software engineering -test 1-(part 4)

RISK MITIGATION TYPES

Risk avoidance
Risk acceptance

Risk transfer

Risk Reduction

Risk avoidance

This is best suited in situations where the costs of mitigating risks are more
than the benefits. Opting to stop construction die to potential storm.

Risk acceptance

Accept the risk, let it happen. Example, Amazon delivery (no guarantee that
the item will be delivered to the right address).

Risk transfer

The process of allocating a portion of risk to a third party. Example, an insurance
policy.

Risk Reduction

Risk reduction involves taking steps to minimize the likelihood or impact of
potential risks. This can include implementing safety measures, conducting regular inspections, or

investing in backup systems.

COCOMO ESTIMATION MODELS (Cont.)

1) It picks an estimation for a project based on the Project mode.
2) Estimate the size of the project, in thousand lines of code (KLOC).

3) Review fifteen factors, known as cost-drivers, and estimate the amount of impact each factor will

have on the project.

4) Determine the effort for the software project by inserting the estimated values into the effort

formula for the chosen mode.

PROJECT

FUNCTION POINT ANALYSIS

The Functional Point Analysis (FPA) is a one of the most popularly used software estimation
technique to measure the functional size of the software work.

The Functional Point (FP) is the measurement of functional size of the software application.

• Each component is assigned a weight, based on three possible descriptions of the project:

1. Simple
2. Average

3. Complex

Number of External Inputs(EI)

Data entry by users & Data or file feeds by
external applications

Number of External Output (EO)

Output screens and reports

Number of external inquiries (EQ)

Prompts and interrupts.

Number of internal files (ILF)

Databases and directories (Data storage)

Number of external interfaces (EIF)

Shared databases and shared routines.

Quiz
software engineering -test 1-(part 3)
Vocabulaire médical
aamupala, juomat
prise en chage des traumatismes
trauma des menbres
mathe
kofu
frilufsliv
Engelska Glosor
FVG 19 Colormanagment
zigge
software engineering -test 1-extra notes (part2)
Software engineering test 1 - extra notes
Gas Exhange, Transport and Breathing Control
Körkortsfrågor
pronomen
Antimikrobiella läkemedel
Globala marknader
religion
vetenskapliga ord vecka 8
lp7
LP7
philo 2 exam 1
Repiratory System
sst uae
kap 4 45-60 ord
LP7 Learning Objectives
kap 4 31-45 ord
kap 4 16-30 ord
kapitel 4 1-15 ord
Unit 6 (3 KL)
BASSIN CHAP 2
kap 1 46-60
kap 1 31-45 ord
kap 1 15-30 ord
kap 1 1-15
kap 3 60-80 ord
kap 3 46-60
BWL1
kap 3 31-45 ord
kap 3 16-30 ord
kap 3 15 ord
glosor
Grekiska för teologer
Spanska
Glosor
Interaktioner
storia della pedagogia
SWE 3313 Midterm part 2
SWE 3313 Midterm part 1